К содержанию
РецензированоEN2022

Improving the pit wall seepage resistance at the V. Grib diamond deposit

Liudmila A. Elantseva · Sergei V. Fomenko

Научные статьи · 2022

Аннотация

V. Grib deposit development includes complex dewatering operations, all water-bearing rocks overlying the mining floor are drained. The open pit is mainly flooded by the Padunsky aquifer system.

Доказательный фрагмент

«V. Grib deposit development includes complex dewatering operations, all water-bearing rocks overlying the mining floor are drained. The open pit is mainly flooded by the Padunsky aquifer system.»

Образец извлечения

Демо-превью

V. Grib deposit development includes complex dewatering operations, all water-bearing rocks overlying the mining floor are drained. The open pit is mainly flooded by the Padunsky aquifer system. Полный текст публикации CiteX не хранит — доступ к первоисточнику открывается по DOI согласно лицензии издателя и выбранному плану.

DOI не указан
Цитирований
0
Тип
Журнал
Страна
Узбекистан
Спросить CiteX об этой работе

Смежные источники