К содержанию
РецензированоEN2021

Problems of construction on insulated forest and weak soils and their solution

M.Bakhromov · U.Rakhmanov · A.Otaboyev

Научные статьи · 2021

Аннотация

The article presents the work of the building in difficult soil conditions, building precipitation, measures to change the rigidity of the building, the main structural measures preventing uneven settlement of buildings and structures. The timing of construction can also affect the process of settlement of a building if its individual parts are erected at different times. The solution to the problem in such cases is to use lighter materials for the later fragments of the building. These can be brick or wood inserts between parts of the building made of reinforced concrete slabs.

Доказательный фрагмент

«The article presents the work of the building in difficult soil conditions, building precipitation, measures to change the rigidity of the building, the main structural measures preventing uneven settlement of buildin…»

Образец извлечения

Демо-превью

The article presents the work of the building in difficult soil conditions, building precipitation, measures to change the rigidity of the building, the main structural measures preventing uneven settlement of buildin… Полный текст публикации CiteX не хранит — доступ к первоисточнику открывается по DOI согласно лицензии издателя и выбранному плану.

DOI не указан
Цитирований
0
Тип
Журнал
Страна
Узбекистан
Спросить CiteX об этой работе

Смежные источники